We use the latest technology equipment to complete our projects with maximum efficiency. With durable and modern machines, we are ready for any challenge.
Experienced Staff
With our team of experts who have years of experience in the field, we bring your projects to life with confidence. Our professional staff is with you at every stage.
Quality Structures
We build long-lasting structures by prioritizing durability, aesthetics, and functionality. We add value to the future without compromising on quality.
Gebze- Darıca Metro Project
Gebze- Darıca Metro Project, LOT 1&2 and 6b&6c NATM tunnel Construction Works
Project Information: 4 no.s metro station, 2×678 m Platform tunnels, 2x3621m track line tunnels, 17 no.s shaft
construction and total length of 1.718 m approach tunnels, connection tunnels, stairway tunnels and pedestrian tunnels.
Work Content: : Excavation, supporting system and concrete lining of metro tunnels.