Kadıköy-Kartal Subway Project
Supply System Works for İstanbul: Kadıköy – Kartal Subway Project
Project Information: Project consist of excavation, supporting systems and lining concreting works for 2,663 m. long tunnels.
Work Content:Turnout Tunnel type T.1.2 L= 476 m., (cross sectional area 171m²) approach tunnel L= 612 m. Main Line Tunnel type A.2.2 L= 1219 m. shaft, stairway tunnel and connection L= 356 m. Total tunnel 2.663 m (173.209 m2) excavation with NATM method.